AIST Homepage Advertise Contact Site Map
  
  LOGIN Register Renew
Steel News
    Home
    Search
    Submit News
    About Steel News

Headlines
    Latest News
    North America
    World

Technology
    Process
    Safety
    Environment and Sustainability

Companies
    Steel Producers
    Service Centers
    Industry Suppliers

Industry
    Trade Cases
    Steel Imports
    World Production

AIST Resources
    Employment
    Magazine
    Steel Calendar
    Steel Library
    Steel Links

 

 

 

 

 

AIST Steel Newss RSS Feed

inductotherm_450x60.gif

SteelNews.com is a publication created by the Association for Iron and Steel Technology (AIST) for the steel community. We are the leading source for technological and innovative news on the people, producers and suppliers in the North American and international steel communities.

 

AK STEEL HEADLINES

Steel Producers / AK Steel Wheeling-Pittsburgh Announces Management Promotions

May 18, 2005

Wheeling-Pittsburgh Steel Corp. announced the promotion of Ron Shoemaker, who had been Manager of Engineering, EAF Project, to the newly created position of General Manager, Engineering & Environmental Control. In his new position, Shoemaker will report to Wheeling-Pittsburgh Steel President, Harry Page.

The company also announced the promotion of Steve Guzy, formerly Division Manager of Hot Strip Rolling and Processing, was promoted to General Manager Primary Operations. Additionally, Glenn Steed, formerly Division Manager of Steelmaking, was promoted to General Manager of Finishing Operations. Both Guzy and Steed will continue to report to Don Keaton, Vice President of Steel Manufacturing and Procurement.

All promotions were effective May 1.

Wheeling-Pittsburgh's promotions come in the midst of the company's planned strategic transition to become a “21st Century”, super-flexible steel producer utilizing the best of both blast furnace and electric arc furnace technology.

The company started up a new ConsteelR continuous steelmaking EAF late last year, producing its first heat on Nov. 29. Hot metal charging into the Consteel furnace was introduced in late April, making it the only EAF in the Western Hemisphere to adopt this practice.

The move to incorporate the new Consteel furnace into the production strategy has helped Wheeling-Pittsburgh to reduce its reliance on its 100-year-old No. 1 Blast Furnace, which was idled in early May.

Commenting on the company’s transition from integrated (blast furnace based) steel production to the new, more flexible combination of the Consteel EAF and blast furnace production, President Harry Page said, "While this is the most visible part of our strategic plan, we also are involved with upgrades in equipment, technology and processes that will allow Wheeling-Pittsburgh to eliminate bottlenecks and meet increased value-added product requirements from our customers.

"Ron, Steve and Glenn are highly knowledgeable and skilled managers who have played key roles for Wheeling-Pittsburgh," Page said. "I look forward to their increased involvement in the successful implementation of our strategic plan. We are fortunate to have this caliber of individuals within our organization."

Shoemaker joined Wheeling-Pittsburgh Steel in 2000 as Division Manager, Technical Services and Planning, after working at Armco and Armco Specialty Steel for more than 20 years in engineering and operating positions. Most recently, Shoemaker was responsible for the construction and installation of the company's new Consteel Electric Arc Furnace. He has a Bachelor of Science Degree in Mechanical Engineering from the University of Kentucky.

Guzy has been with Wheeling-Pittsburgh for 27 years, the past seven as Division Manager of Hot Strip Rolling and Processing. Guzy has a Bachelor of Science Degree from California University of Pennsylvania in business management and economics and has completed a management training program in manufacturing technology from Cornell University.

Steed has 17 years of steel industry experience. At Wheeling-Pittsburgh Steel, he has been Division Manager of both Steelmaking Division and the Yorkville Plant and was responsible for the production startup of the company's Electric Arc Furnace. Steed has a Bachelor of Science Degree in Metallurgical Engineering from Ohio State University. Before joined Wheeling-Pittsburgh Steel in 2000 he was with AK Steel's Ashland, Ky., works where he had a series of increasingly responsible positions.


Wheeling-Pittsburgh is a steel company engaged in the making, processing and fabrication of steel and steel products using both integrated and electric arc furnace technology. The Company's products include hot rolled and cold rolled sheet and coated products such as galvanized, pre-painted and tin mill sheet. The Company also produces a variety of steel products including roll formed corrugated roofing, roof deck, floor deck, bridgeform and other products used primarily by the construction, highway and agricultural markets.





   

 

 

Proco
Unique Lubricant
Global Gauge
Inductotherm.gif
Advertise on Steelnews.com
 



 

Association for Iron & Steel Technology
186 Thorn Hill Road • Warrendale, PA 15086-7528 USA
(724) 814-3000 • Fax: (724) 814-3001 • memberservices@aist.org